PROJECT DETAILS

  • Construction Date: March 2017
  • Location: Newport Beach, CA
  • Surface Area:  35 ft2
  • Client: Mary Schultz
  • Category: Water restoration with bathroom remodel

ABOUT THIS PROJECT

Bathroom shower had a shower pan failure that caused a leak in the entire first floor of the home. We replaced the floors and the customer took the opportunity to upgrade their bathroom at the same time.

HAVE A SIMILAR PROJECT?