PROJECT DETAILS

  • Construction Date: November 2017
  • Location: Mission Viejo, CA
  • Surface Area:  450 ft2
  • Client: Cathy Rush
  • Category: Home Remodel

ABOUT THIS PROJECT

A second story deck suffered water damage from a leak in the original deck system. We demolished, rebuilt the structure and installed a new decking system. In addition we changed the overall deck layout, added a new vinyl rail and painted the entire exterior of the home.

HAVE A SIMILAR PROJECT?